HTCCI recently replaced brick stairs that were falling apart with granite stairs and platform. The old stairs were removed and new concrete base was installed. Lead flashing was installed to prevent water migration into the sills/basement. New custom wrought iron railings are being fabricated.
Concrete base and lead flashing
First tread and side pieces installed
Second and third treads installed
Completed stairs - waiting for custom railing fabrication to be completed
No comments:
Post a Comment